Our Services
Brittany Plans
Our Services
Welcome to our website; where you may find all, you need to know about building permits and work declarations. As specialised Architectural Designers and Project Managers, we assist you at every stage of your project, whether it is the construction of a house, an extension to your existing property, garage, swimming pool, or any other structure that requires administrative approval.
Our services cover a wide range of demands, including construction permits for attic conversions, relocation, building permits. In addition, we provide extensive support with work declarations, whether for a home restoration, elevation, extension, or garden shed installation.
We supply architectural plans, including mass, section, facade, and location plans, which are required for your construction permit application.
We have developed our website to provide a hopeful useful guide to the technical components of construction in France, such as the footprint, floor area, taxable area, and the significance of the land-use coefficient. We assist you in understanding the current thermal standards, including RT 2012 and RT 2020, as well as practical building information such as planning requirements and how to select the appropriate CERFA form for your project.
Whether you are a construction professional or a person wishing to learn more about the building permit application process here within France, we are here to help.
Please browse our website for hopefully of wealth of useful information, and please do not hesitate to contact us if you have any questions or service requirement requests, where we will be pleased to assist wherever practically possible.
Brittany Plans + Project Management; are a Multi–discipline Architectural Design and Project Management practice based in the rural village of Merdrignac 22230, Cotes d’Armor, Brittany, along with our partnering architect located in Sainte Nazzaire, Valantane regions of France.
We have, between the members of our team, over 50 years of experience in the architecture design, Project Management, including over 30 years best international practice experience of commercial, leisure, residential design, and renovation projects.
We feel we are ideally situated within Merdrignac to cover projects in the whole of Brittany, Normandy and the Limoges, Bordeaux regions of France and beyond.
Our Partnering French Registered Architect, who is registered with both (RIBA, Ordre des Architectes), operates from Sainte Nazzaire, Valantane 82190.
As a team we have vast working knowledge and experience, having successfully completed projects throughout France, United Kingdom & Channel Islands and wider internationally within, Dubai, Abu Dhabi, Egypt, Tunisia, Morocco, Kuwait, Iraq, Afghanistan, Jordon, Iraq, Sultanate of Oman, Kingdom of Saudi Arabia, and many more locations.
Brittany Plans + Project Management (Paul Bradford) SIRET: 894 660 554 00029
Works activity Code 71.11z – (Architectural activities)
Services:
Within our British trained and educated French-registered Architectural team, and Project Management (Maître d’Oeuvre) services, we are able to deal with all your planning application types; building design drawings and project management (Maître d’Oeuvre) services for: Residential, Retail, Commercial, Industrial Units, Hotels, Hospitality, Leisure and Education facility projects.
Permis de Démolir (PD)
(Demolitions permit)
(Demolitions permit)Permis de Construire (PC)
(Full Planning)
Déclaration Préalable (DP)
(Minor Works)
Sécurité
(Fire Safety Regulations)
Certificat d’Urbanisme (CU)
(Outline Permission)
Certificat d’Urbanisme (CU)
(Outline Permission)
We offer a comprehensive Residential Service: Covering all aspects of your projects planning, design and construction works requirements, from project inception to completion and handover of your completed project, including where required site supervision and key stage progress reports by arrangement; project types ranging from complete renovation, conversions, loft conversions, new build tradition or contemporary designed homes, extensions, along with both internal and external below ground swimming pools.
We also offer a comprehensive Commercial Service: Covering all aspects of the planning, design and construction works by agreement, from inception to completion and handover of your completed project, including where required full site supervision and key stage progress reports by arrangement; project types ranging from Industrial and Retail Units, Hospitality and Leisure Facilities (Licensed Hotels and Restaurants), Commercial / Offices and Education facilities.
Within Brittany Plans + Project Management, we are able to provide you with all your full architectural design, planning and project management (Maître d’Oeuvre) services requirements, throughout the whole of Brittany, Normandy and wider regions within France under one unique business.
No matter how small or large your project requirements, we are able to personally help you to for fill your design aspirations, dreams and functional requirements, within an affordable fee structure price for:
New build
Commercial & Retail
Renovation
Industrial
Loft Conversion
Hotels, Hospitality
Conversions
Leisure Facilities
Education Facilities
Project Management
Our Design Process
We can do as much or as little as you need to for fill your projects requirements: whatever the size of your project, including where required site supervision and compilation of key stage progress reports by arrangement; project types ranging from; complete renovations, conversions, loft conversions, new build traditional or contemporary designed homes, to small crafted extensions.
We will tailor our services specifically for the explicit requirements of your project; we fully understand that one size does not fit all. Every project is different as its size, geographical location and specific requirements. To this end, we offer a range of different specifications to suit the requirements of your project.
We believe every project, no matter how large or small in scope and complexity, should achieve the same level of outstanding performance for our end user valued clients.
We have the vision and experience to ensure that you are guided through each stage of your project to a successful outcome.
We typically follow a simple six step/stage process to guide you through your project, but for larger project we would broadly follow the ‘’Plan of Works’’ published by the Royal Institute of British Architects (RIBA).

Small Project Plan of Works
For smaller projects we tailor our services to a simple six stage process, this we believe provides our clients with a clean, easy to follow plan of works to guide you through the design, planning and construction phase.

Large Project – Full RIBA Plan of Works
For larger projects, we would broadly follow the full ‘’RIBA Plan of Work’’ as published by Royal Institute of British Architects in all stages, where project management and contact administration services are generally required.
Any size project undertaken, anywhere in Brittany, Normandy and wider regions throughout the whole of France.

Project Services Summary:
Preparation of your projects—Permis/Permit Applications Dossiers
Computer generated floor plans & Interior layouts
Project design elevations & cross-sections.
CGI — (Computer Generated Images) visualisations.
Electrical & Plumbing schematic design layouts.
Retrospective project planning applications.
Preparation of post ‘’ Permis de Construire ‘’ permit approval,
Construction & Tender / Devis drawing packages.
Project Types:
Self-Build.
Design & Build with an appointed Contractor.
Traditional Build and Contract Administration – (CCMI).
Project Management Services